Thread: Halyard Failure
View Single Post
  #4  
Old 08-09-2012, 10:54 AM
billknny billknny is offline
Junior Member
 
Join Date: Aug 2005
Location: Sausalito, CA
Posts: 25
Send a message via Yahoo to billknny
Default More info...

The Vizzion that failed was 3/8", which compares reasonably well with the 9mm Spectra that is the boat designers spec. So I don't think it is a simple undersize issue.

I find it hard NOT to blame the clutch, since the core looked so bad ONLY in the area of the clutch. It literally crumbled in my hands, while a foot away it was fine. The fact that the cover looked unaffected is a mystery of the universe.

As for the crew possibly over-tensioning: this boat is in charter service. Whatever could possibly be done wrong has, I am sure, been done.

The part I find disturbing about this is that nobody would have condemned this line with a visual inspection. I obviously need to revisit my assumption that the cover tells me what I need to know about the condition of a high tech core

Quote:
Originally Posted by Brion Toss View Post
Hi,
That is indeed scary. If the halyard is indeed Vizzion, it is a composite core, with non-structural polyolefin as filler for Vectran, which takes all the load. This halyard makes sense when you (a) want to save money, (b) still want HM performance, and (c) want a fatter, easier-to-handle line. But if you, say, replaced an all-HM core with this blend, and didn't change the diameter (because of "a", above), you'd have a halyard that was at best only half as strong as it used to be. And if, as so often happens on go-fasts, the original, all-HM core rope wasn't exactly oversized, you'll be putting a horrendous load on a relatively weak rope.
This is all speculation, of course, but you could confirm at least some of this by, wait for it, running the numbers on halyard load, and comparing the result with the strength of the rope you have.
It is not likely that the clutch is to blame, else you would have seen more chafe on the cover. But one other variable is how much tension is placed on the halyard by the crew; overtensioning would make things even worse.
So I don't think that a replacement schedule, by itself, would necessarily help, if the problem is that the rope is not up to the loads. Please get back to us about this.
Fair leads,
Brion Toss
Reply With Quote