SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #4  
Old 03-16-2007, 11:38 PM
Amgine
 
Posts: n/a
Default From "Apprentice"...

I'm trying to work from the Apprentice, pg 136, but the graph of course does not go down to 18.165' waterlines. I'm estimating again, but using a figure of 8,000 for the RM30.

That would give a shroud load of 3,000 lbs. I'm not sure I understood the section regarding selecting wire, mostly the bit in which the load is broken out between uppers and lowers. The cap shrouds by a safety factor of 2.5 would be dealing with a load of 7,500, and the lowers 32.5% of this.

Going to the appendix for 1x19 ss 302/304 that suggests 7/32" or 1/4" wire for the cap, 1/8" or 5/32" for the lowers, probably the larger diameter for each.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 02:26 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.