SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 02-18-2008, 05:11 PM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default It can be done

Hello,
This is one of our favorite things to do, not the least because, as you say, it makes for better use of materials. I hope to be providing details of some of these splices in a book and/or video in the foreseeable future. Meanwhile, it is first of all vital that you do actual destruction tests, not approximations with a chain hoist, so that you will know your tolerances. We have tested some of our splices at right about 100% of the HM line's strength, so I know it can be done. We have Brummeled the two cores together for some applications, simply buried it a long way for others. For halyards, one key is that the splice should usually be well past the winch and stopper before any significant load comes on. That way you don't have to recruit the total strength of the fatter rope, just the core. If you want to recruit some or all of the cover strength, you will need a long bury of the HM, plus stitching. This seems to work better than a long bury of cover inside the HM.
When you do bury the cover end, put the whole thing in, tapered, usually for a foot or so. Stitch so that it can't fall out; there won't be any load on it.
Fair leads,
Brion Toss
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 03:02 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.