SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #5  
Old 05-10-2008, 08:24 AM
benz benz is offline
Senior Member
 
Join Date: Sep 2006
Location: Newport RI
Posts: 244
Default

Thanks, Brian

The rubber foot thing is a good idea. Your instinct was correct: the base has holes for 3/4 bolts. Since I designed the partners to have a pole go through them instead of on them, I'll probably still just chop off that base and keel-step the thing, but still, I like to fully explore all the options.
I've heard good testimonials on welded masts, but being the worrier that I am, I know I would spend every dark and stormy night just waiting for that weld to fail, and balefully eyeing the place on the mast where I knew it to be.
When you sleeve two poles, do you manage to find a separate piece of tubing with just the right OD to fit inside the two pieces being joined, or do you take a bit of the same tubing and slit it lengthwise to make it smaller around?
Ben
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 07:16 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.