![]() |
EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
#3
|
|||
|
|||
![]() Hi,
The reason I got the 9/16" vectran was because it was cheaper to get one 600 foot roll of one size than to get shorter lengths in various sizes. The 9/16" covers the strength I need in the bowsprit/ jibboom rigging. It is only 11lbs per 100 feet, so I still will lose a lot of weight aloft in the topmast rigging. (I have also swithched from making solid topmasts, yardarms, and gaffs to hollow ones). What would be a good way to avoid torque when serving vectran? I'll contact the manufacturers of the wire and vectran to determine what tension bar taut is. Also, I am thinking about iron strops on both upper and lower deadeyes. The shrouds can have poured spelter socket terminals to attach to iron strop. The 5/8" 1x19 is rather stiff and this seems to be a tidier and more practical method. No experience in serving a rig... yet. Still need to get a serving mallet. I am learning as I go. This is why I would like to figure out ahead of time what sort of preperation I need. It seems that it would be best to cut each piece so I am working with shorter lengths. Would it work to stretch the wire taut, serve, then install? The principal reason for this post is to figure out whether I should leave the wire rope and vectran on their spools til I get to port townsend or, get started on it on Orcas. I have the space to stretch the wire here. Is there a practical location to anchor the material and serve in port townsend? Thank you, Jim
__________________
Captain Kruse |
Thread Tools | |
Display Modes | |
|
|