![]() |
EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
#1
|
|||
|
|||
![]() Hello all,
I have replaced my old jib sheets with new 3/8 inch double braid. The winches I have on my 1962 Columbia 29 are original, so the drums are pretty slick. So, needless to say, I need a lot of wraps around the winch to create enough friction, especially when the wind pipes up. Also requires more force on the tailing end of the line. Question: Is there a way to modify the old winches, such as having the drums knurled by a machine shop, or any other method that will cause better friction on the drums without causing to much chafe on the new lines. Ideas welcome. Thanks. Bob |
Thread Tools | |
Display Modes | |
|
|