![]() |
EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
#11
|
|||
|
|||
![]() Hi again,
When you make this type of splice, the part you bury the tail in gets fatter and shorter -- like we all do -- so you need to add a bit to compensate before splicing. The amount will vary depending on rope construction and diameter, as well as the overall length and the taper of the tail. A couple of inches is fairly typical, but you can zero in by making a mark a known distance from the bearing point of the eye, before splicing, and then seeing how much it has moved after splicing. Also, have you also deducted for constructional stretch? In most HM it is about a foot in fifty feet. Fair leads, Brion Toss |
#12
|
|||
|
|||
![]() Hello all.
Brion. Thanks for your latest reply on my post. Possibly when I put a lot of tension on the life lines, I will gain a couple of inches in the process. Is it a common practice to pre-stretch the HM lines before attempting a splice, especially when you are talking long lengths as in stays and shrouds? Or is this measurement something riggers compensate for through experience? Possibly both? And and at what point would you be certain to have stretched enough for proper measurement thereafter? Thanks. |
![]() |
Thread Tools | |
Display Modes | |
|
|