![]() |
EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
|
#1
|
|||
|
|||
![]() Hi,
The reason I got the 9/16" vectran was because it was cheaper to get one 600 foot roll of one size than to get shorter lengths in various sizes. The 9/16" covers the strength I need in the bowsprit/ jibboom rigging. It is only 11lbs per 100 feet, so I still will lose a lot of weight aloft in the topmast rigging. (I have also swithched from making solid topmasts, yardarms, and gaffs to hollow ones). What would be a good way to avoid torque when serving vectran? I'll contact the manufacturers of the wire and vectran to determine what tension bar taut is. Also, I am thinking about iron strops on both upper and lower deadeyes. The shrouds can have poured spelter socket terminals to attach to iron strop. The 5/8" 1x19 is rather stiff and this seems to be a tidier and more practical method. No experience in serving a rig... yet. Still need to get a serving mallet. I am learning as I go. This is why I would like to figure out ahead of time what sort of preperation I need. It seems that it would be best to cut each piece so I am working with shorter lengths. Would it work to stretch the wire taut, serve, then install? The principal reason for this post is to figure out whether I should leave the wire rope and vectran on their spools til I get to port townsend or, get started on it on Orcas. I have the space to stretch the wire here. Is there a practical location to anchor the material and serve in port townsend? Thank you, Jim
__________________
Captain Kruse |
#2
|
|||
|
|||
![]() Hello again,
Okey-dokey. Bar taut is a fairly subjective term; it will probably be in excess of 5% of the break, but you'll know it when you feel it.Stretching and serving individual pieces is the only way to go, so you'll need to have a good idea of finished length before cutting. If you do sockets, just stop short of where they'll go, and leave enough extra twine to finish service after socketing. As for the Vectran, the more tension the better, for avoiding torque, but the big thing is to "tune" the mallet so that the turns are just tight enough, and no more. And here you'll be serving after you splice the ends. And when you splice the ends, you shorten the rope, so that must be figured into the cut length. Fair leads, Brion Toss |
![]() |
Thread Tools | |
Display Modes | |
|
|