SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3  
Old 09-18-2010, 09:47 AM
Mariner4152 Mariner4152 is offline
Junior Member
 
Join Date: Sep 2010
Location: Silvis Ill
Posts: 2
Default

Thanks for the info. Probably build the first pair from a cheaper rope the first time to work out the bugs in the system.

With respect to being adjustable, that was the plan for the check blocks up near the top of the mast then lead the halyards back to the bottom and cleat them off. That way I could raise or lower the lazy jacks as needed. The area of concern for me is where the legs attach to the boom. Do I need the legs to be adjustable or is it Ok to just terminate them at the boom? Should the front legs have more slack to allow for more sail bulk?

Thanks again.
Greg.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 06:06 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.