SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #1  
Old 01-30-2012, 10:05 AM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Right Track

Hi there,
Yeeks, someone got unengineeredly creative there. Cut off that tab, as you described. Ream the deformed hole to accept a shouldered stainless bushing, suitable for a 1/2" throughbolt. This will clean up the deformation in mast and tangs, plus provide a larger bearing surface. Hang a pair of double tangs on the throughbolt, the threads of which will have been cut so that they stop when they reach the bushing. That way you don't need a compression tube. I have the bushings if you can't find them locally.
If the old tangs are in good shape, and if they are properly bent to lead fair to the shroud and square to the pins, use those. Otherwise get new ones.
Fair leads,
Brion Toss
Reply With Quote
  #2  
Old 01-30-2012, 11:26 PM
Brob76 Brob76 is offline
Junior Member
 
Join Date: Jan 2012
Location: NYC
Posts: 2
Default

Hi Brion,
Thanks much for the quick response. The deformed hole I was referring to is the one in the tab I plan to cut cut off. It is the hole the double triangle plate rode on. The hole I am planning to mount the tangs on is the lower hole of the spreader fitting in the picture (once the tab is removed). That hole and the corresponding hole in the mast wall are still in good shape..perfectly symmetrical. There are currently compression tubes for both lower and upper spreader fitting holes. Do you think it would still be prudent to over-drill the mast wall for 11/16x1/2 (or even 3/4x2) flange bushings to increase bearing surface shear strength? Something I'm not clear on is elimination the compression tubes. I understand the concept of eliminating the need for compression tubes if the threads stop short of the flange but being that these are spreader fittings, won't the compressive load on the spreaders tend to crush the mast without the tubes?

When you reference hanging double tangs on the through-bolt, are you referring to double strap style tangs like the ones shown in the last picture above? I was planning to fabricate similar tangs and use toggle forks. The old fittings are double triangle plates that hang off that tab I'm removing with eye fitting between. These fittings are not bent. The tab I am removing was the part that was bent out to provide the fair lead. The new tangs will be bent the same as the tab so the shrouds lead fair.

Thanks for your help,

Brian
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 03:04 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.