SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 03-14-2006, 11:16 AM
Unregistered
 
Posts: n/a
Default why fuss with the rig?

Hi there,

Not to pooh-pooh your idea, but changing from the 3/4 rig to a masthead rig here would involve a re-rig to get those uppers up to the top of the mast and to remove the jumpers. Plus, I think you'd lose alot of the flexability of the rig as it is (or as it usually is - I'm not sure if what you have now conforms to the plans ...) which you need to take advantage of that big main. Then, the foretriangle here isn't very big to begin with - the class plan shows two sails - a 106sf working jib and a 168sf genoa - have you tried this larger sail? That might be alot cheaper and faster than mussing up the rig as designed.

Best,


Jason
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 11:18 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.