![]() |
EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
#8
|
|||
|
|||
![]() Quote:
Asymmetric: 90 m2 / 969 ft2 Code 0: 80 m2 / 861 ft2 Staysail: 30 m2 / 322 ft2 The 1:2 halyard for the staysail (solent jib = 26 m2) have the standing end attached to a stay tang while the running part goes over one of the mast head sheaves (via a lead block). So the load on the winch/clutch/sheave is still acceptable. The spinnaker halyard block attachment has been strengthened by fitting a new custom designed spinnaker crane (to carry the load from the code 0) and beefed up blocks. The bowsprit have three positions (fully retracted, half way out and fully extended) and is fitted with an adjustable bob stay. When we use the Code 0 the bowsprit is set in the half way out position. The code 0 sets on 1:1 halyard but have an 1:2 adjustable tack line My storm stays'l is set on a wire stay ![]() Note on loads: When we bought this boat the solent jib was on the sail inventory. The original setup by the PO had a halyard box (where I now have the stay tang) with a 1:1 halyard and a 1:2 tackle at the tack. The sheave in the halyard box where lost - probably damaged by overloading, so yes there are forces in play here. I think I can understand why - this is the procedure he described Dont try this at home Quote:
Last edited by knuterikt : 12-17-2012 at 03:56 AM. Reason: Added note on loads |
Thread Tools | |
Display Modes | |
|
|