SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #27  
Old 03-07-2015, 06:42 PM
Anton B Anton B is offline
Junior Member
 
Join Date: Dec 2014
Posts: 25
Default

I attached the one end in several different ways, only in order to get the length right, not having taken any care in the length of the connecting line. None of which affected how they broke.

They broke at the end of the bury in the spliced line for the most part. The eye and the knot breaking were anomalies.

I will re-do the test with more care, and better pictures and I hope I will confirm that the breaking point will consistently be the bury and not the knot, and not the eye, but we shall see.

I am pretty sure I have already proved that it will break at close to line strength, in the application the tension is probably less than 20% of breaking strength even at peak loads, I just wanted to make sure that there wouldn't be some freak situation at the diamond knot that would give me less than 50% strength.

What I am doing is exactly like Allen's Soft Halyard, only with more diamond knots. In 9 test pulls, it never broke at the diamond knot closest to the loop, only at the last knot, the one the eye was pulling on, and seemed to break at about 80% of line strength.

I'm pretty happy with that.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 12:38 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.